Manufacturer first, your own program second — and log everything
Most consumer drones ship with no maintenance program at all - which makes YOU the maintenance department.
107.15 requires the preflight condition check; structure beyond that comes from the manufacturer or from you - and the exam's tested ordering is manufacturer FIRST, self-built only in its absence. The FAA's six tracked categories: overhaul, repairs, inspections, modifications, part replacements, software upgrades. His manned-aviation upgrade: a logbook per life-limited part (motor, prop, airframe), scheduled inspections at 50 hours, 100 hours, annually, and age-at-swap entries that surface failure TRENDS - props dying around hour 50 become predictable replacements instead of inflight failures. The receipt: DJI's Inspire TB50/TB55 cell-weakness saga, catchable early by exactly this tracking. Hours logging gets a forward-looking nudge: no minimums exist today, 'but who knows, in the future.'
Multi-drone, multi-pilot operations live or die on this paper trail - and the manufacturer-first rule is a direct exam answer.
Go deeper
In one line: 107.15 = preflight check duty; program from manufacturer first, self-built otherwise; track six categories in per-part logbooks at 50/100/annual intervals; log hours against future requirements.
Only 107.15 regulates; the rest is recommended practice (l4712 0:00)
EXAM: consult manufacturer first; build your own only if none (l4721 0:00)
Six categories incl. software upgrades (l4712 0:00)
Trend-spotting via age-at-swap logging (l4713 0:01)
TB50/TB55 battery case as the motivating example (l4713 0:01)
▶ Watch this taught: